Reaching Stable Output on the First Production Day
- Production capacity
- 9,000 pcs/day achieved on the first production day after installation
- Customer benefit
- Fast production start-up with reduced operator dependency
Challenge: The customer needed rapid overseas ramp-up, but operators had limited experience with the full automated line. The line needed to stabilize feeding, riveting, electrical testing and unloading quickly after installation.
SolarOne solution: Engineers tuned the feeding sequence, fixture positioning, riveting parameters and testing station logic on site. Operator training focused on fault recovery, material preparation and daily maintenance routines.
Result: The production line reached 9,000 pcs/day on the first production day, giving the customer a faster path from installation to stable manufacturing.